KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  11-20-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Interior

Removed all the interior parts. Drilled out to correct size, deburred, cleaned up edges. Installed Tinnerman nuts where required.

Put everything back in using real bolts to verify everyting fitts. Don't want to be doing this with a covered and painted fueselage.

Made the floorpan removeable by using screws and nutplates where the plans showed pop rivets. Still will require removing a bunch of stuff,
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.