Powered By Kitlog Pro v2.0
Bruces Web Site
S-20
All
11-20-2016
< Previous Log Entry
Next Log Entry >
Date:
11-20-2016
Number of Hours:
4.00
Manual Reference:
Brief Description:
Interior
Removed all the interior parts. Drilled out to correct size, deburred, cleaned up edges. Installed Tinnerman nuts where required.
Put everything back in using real bolts to verify everyting fitts. Don't want to be doing this with a covered and painted fueselage.
Made the floorpan removeable by using screws and nutplates where the plans showed pop rivets. Still will require removing a bunch of stuff,
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Home
Category
# Logs
# Hours
All
95
1610
Empennage
17
305
Fuselage
51
1005
Miscellaneous
7
68
Wings
20
232
RV-10 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.