KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  1-6-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Cover plate, com antenna, steps

Installing cover plates. Put on front floor, all tunnel and step access cover plates with either half the screws on things that will come off before flight or all the bolts.

Put final bolts on the 2 com antenna with help from Jim. Installed the steps on both sides, the bottom nut on one side was real fun due to some conduit. All floor covers complete.

Started on the seat heater wiring.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.