KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  1-5-2014
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Final assembly inside.

Removed all the interior panels, seats, covers and etc. Cleaned and vacuumed the interior and the tunnel. Starting at the front of the tunnel, verified all the plumbing fittings were tight and right, checked the electrical and nuts and bolts. All is Ok for flight.

Cut the air lines and installed the front and rear seat heating SCAT tubes. The clamps up front were not the easiest to get in.

Put the center console back in with final screws.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.