Powered By Kitlog Pro v2.0
Bruces Web Site
RV-10
Fuselage
11-7-2012
< Previous Log Entry
Next Log Entry >
Date:
11-7-2012
Number of Hours:
3.00
Manual Reference:
Brief Description:
Stick and misc.
Drilled one stick for the taper pin. Other is on hold while I get a taper pin macined down to size. Installed some of the control stick in final.
Riveted up the pushrods and then primed the outside. Can install tomorrow. Mounted the elevator autopilot servo mount on the bellcrank frame.
Brake line fittings arrived in the mail so will do the lines tomorrow. Mounted the brake reservoir.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Home
RV-10 Home
Category
# Logs
# Hours
All
584
2745
Avionics
95
350
Doors and Latches
30
104
Empennage
64
305
Engine
73
310
Finishing details
23
76
Flight Testing
9
32
Fuselage
197
1005
Interior
17
69
Miscellaneous
12
68
None
2
8
Overhead console
3
11
Painting
8
105
Soaring
1
Tailcone
17
70
Wings
33
232
Copyright © 2001-2024 Matronics. All Rights Reserved.