Completed two access openings in baggage floor. Will allow easy access to the bolt that holds the step in place. Step in the -6A has a crack and the -10 have had cracks. Easy replacement now.
Also is large enough to reach a COM antenna that will be mounted right behind the step, on both sides.
Total time invested in two access ports and covesr is about 5.5 hours. About typical of modifications to the basic design.