Powered By Kitlog Pro v2.0
Bruces Web Site
RV-10
Fuselage
10-8-2012
< Previous Log Entry
Next Log Entry >
Date:
10-8-2012
Number of Hours:
5.50
Manual Reference:
Brief Description:
Baggage area. foors, frame
Installed baggage and passenger seat area floors. Drilled out. Installed baggage door frames.
Removed all, drilled stiffener angles, deburred all but skins
Started to layout an access hatch to the step bolt and a possible com antenna in the baggage area. First mod to the ship.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Home
RV-10 Home
Category
# Logs
# Hours
All
584
2745
Avionics
95
350
Doors and Latches
30
104
Empennage
64
305
Engine
73
310
Finishing details
23
76
Flight Testing
9
32
Fuselage
197
1005
Interior
17
69
Miscellaneous
12
68
None
2
8
Overhead console
3
11
Painting
8
105
Soaring
1
Tailcone
17
70
Wings
33
232
Copyright © 2001-2024 Matronics. All Rights Reserved.