|
|
Harteveld, Chinook Plus 2
|
Date: 8-21-2016
|
Number of Hours: 2.00
|
Manual Reference: Steps 7 & 8
|
Brief Description: Implementing advice on Root Tube assembly, and jum
|
|
Factory advice on Step 7 was to pull the parts out of the vice and install in place, at top of Down Tubes. Did that. Took a while due to the need to ream and twist the parts a bit. Lot's of metal up there, some under tension. Finally was able to dry fit all, however. I still see the gap that caused the original concern, so uploaded another video to YouTube and emailed AM for advice.
In the interim, I stepped ahead to Step 8, and attached the Leading Edge Channel. Dry-fit, only. Don't want to cinch it all down in case the Step 7 issue requires some dis-assembly to mitigate.
Quickie Sunday session.
|
|
...and just like that, it gets three-dimensional
|
|
Front of Root Tube assembly
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |