|
|
|
|
Harteveld, Chinook Plus 2
|
Date: 8-20-2016
|
Number of Hours: 6.00
|
Manual Reference: Step 7, Step 18
|
Brief Description: Top keel, down tubes, and bungees
|
|
Leaping into Step 7, associated with assembling what willbe the top of the fuselage, and connecting it to the forward down tubes. Unfortunately, some consternation with placement of pre-drilled holes in theTop Window Plate. Great back-n-forth with the factory, though I have yet to learn verdict. As always, support form Aeroplane Manufactury is fast and fantastic.
In the interim, I skipped ahead to Step 18, bungee installation. some question about bolt/hole size, but I chose to forge ahead, regardless. Was able to install the bungees [great pix in the manual], but the instructions clearly stipulate that I should get two complete wraps, while I onlly had the mudcle/ leverage to make 1.5. Checking with factory to determine if that is okay.
|
|
Questions about hole alignment on the Top Window Plate
|
|
Bungees! Is 6 cords on top enough? What if I go on a diet?
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |