KitLog pro

Powered By Kitlog Pro v2.0

Don's RV-8 Build Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-12-2020
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Vert Stab work continued

Dimpled the lower holes on VS-803 to accept AN426 AD4 rivets. Countersunk cooresponding holes in VS-808 doubler to mathc the spar. Finished surface prepping all VS structure pieces with exception of the skin. Once the hnagar gest above 95 degrees on these hot days its time to call it quits.
' style=

Dimpling lower holes on VS-803 spar

Dimpling lower holes on VS-803 spar

' style=

Countersunk holes on VS-808 doubler

Countersunk holes on VS-808 doubler

' style=

Surface prepped, ready for dimpling.

Surface prepped, ready for dimpling.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.