KitLog pro

Powered By Kitlog Pro v2.0

Roberts Web Site
' style=
Date:  4-23-2007
Number of Hours:  3.00
Manual Reference:  Elevators
Brief Description:  Put a sock on it

Today was a hugh day. Got so much done. Both elevators are covered and heat shrunk. The right wing is covered and heat shrunk. Holes are drilled for the ailerons and ready for Poly Brush. Then we brought out the left wing ,installed the last light and prepped it for covering. There isn't one single whrinkle in that right wing and the leading edge is as smooth as silk and no uggly scollop look.
' style=

Gluing sock to elevator

Gluing sock to elevator

' style=




' style=

Right wing. ready for Poly Brush

Right wing. ready for Poly Brush

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.