Brief Description: Right Wing LE Assy. & Fuel Tank Install
Today I started off by squeezing the remainder of the LP 4-3 & LP 4-4 Pop rivets on the wing spar/LE assy rib flanges. I ran out of these rivets a week or so ago and had to order more from Spruce. Anyway...that is now complete. Used the close space rivet puller for this task. I then used the air squeezer to squeeze the AN426 4-4 and 4-4.5 flush rivets along the LE assy rivet row/wing spar row. Next came the install of the right fuel tank. Installed all screws and z-bracket 3/8" bolts.
Still left undone on right wing: torque z-bracket bolts & apply orange torque seal.
Will do this next session as well as run wire for left tank fuel sender & install all left tank screws and z-bracket bolts (torque & seal).