Today I started by using the air squeezer to install all of the AN426-3-4 and -4.5 rivets in the top and bottom rivet lines. These are the rivets that join the LE assy to the main wing spar. They came out really good. Then I installed the left wing fuel tank with screws only...no z-bracket bolts yet as I need to track down the size of wire needed to route for the fuel sender. I will try to find out on VAF this evening. Then I installed the right wing LE assy and clecoed it in. I then popped some LP-4-3 and -4-4 rivets until I ran out. Will order more tonight. Also, I cleaned up the right wing spar and LE tank assy prior to installing.
Next session I will pull wires for nav/strobe/landing lights as well as fuel sender in left tank. I will also start working in the ailerons.
Lft LE Assy & Pitot Tube Union all riveted to spar