KitLog pro

Powered By Kitlog Pro v2.0

Ricks Web Site
' style=
Date:  4-16-2021
Number of Hours:  4.50
Manual Reference:  Various
Brief Description:  Firewall forward punch list

I finished the install of the Rieff preheater after the epoxy cured. Installed scat ducting on the cabin heat and carb airbox. I can't finish the inlet side to airbox until the engine cowling comes back from paint shop to be sure I have clearance for the filter.

I started to add coolant to the system and checking for leaks, none found but I seem to have air trapped somewhere as the system didn't take as much coolant as Rotax install manual states and I didn't find any information in the Rans manual on coolant capacity.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.