KitLog pro

Powered By Kitlog Pro v2.0

Ricks Web Site
' style=
Date:  9-1-2020
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Prep float tops

After waiting a couple of days for the float bottoms to completely dry we flipped them over and began the cleaning and prep on the top of the floats. I also needed to rivet on the float walkways.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.