KitLog pro

Powered By Kitlog Pro v2.0

Building Juliette Whiskey
' style=
Date:  7-17-2006
Number of Hours:  3.00
Manual Reference:  Section 6
Brief Description:  Elevator Stiffeners

I used the 3 inch scotch-bright wheel in the drill press to debur the rest of the right elevator stiffeners and it was much faster then using the bench grinder. I then fabricated the remainder of the stiffeners for the left side of the elevator and deburred them. I was going to call it a night, but decided to work another hour, because I will not work on the plane tomorrow (We have a Tigers game and it is my daughter's birthday). I layed out the right elevator skin and clecoed all of the stiffeners in place. I again used a piece of OSB so I could drill right into the bench top. Next up is hole deburring and drilling the left side skins and stiffeners. Hopefully I'll be priming before the weekend.
' style=

Drill press Deburring

Drill press Deburring

' style=

Empenage stiffeners

Empenage stiffeners

' style=

Match drilling stiffeners

Match drilling stiffeners

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.