KitLog pro

Powered By Kitlog Pro v2.0

Building Juliette Whiskey
' style=
Date:  8-18-2006
Number of Hours:  1.25
Manual Reference:  Section 6
Brief Description:  Primed elevator parts

I set up the chicken wire rack in the yard and began to move the elevator parts to the rack. I mixed the AKZO primer, because you have to let it sit for 30 before you can spray it. It was getting dark and cloudy out and I wanted to prime before it started to rain. Everything went according to schedule and I completed the priming in about an hour. I will be ready to do final assembly tomorrow (Saturday)
' style=

Elevator parts alodined and on the rack for priming.  Note the spayer I use on the right.

Elevator parts alodined and on the rack for priming. Note the spayer I use on the right.

' style=

The AKZO primer I am using needs to sit for 30 minutes after mixing part A to part B.

The AKZO primer I am using needs to sit for 30 minutes after mixing part A to part B.

' style=

The parts dry in 5 minutes, so I brought them back in to the shop.  Ready for final assembly

The parts dry in 5 minutes, so I brought them back in to the shop. Ready for final assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.