KitLog pro

Powered By Kitlog Pro v2.0

Building Juliette Whiskey
' style=
Date:  3-10-2009
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Brake Lines & Front Deck

Today I finished the brake lines in the cabin. I ordered some fuel lube Sunday and will wait for that in order to finish the fuel line attachments to the fuel valve. I also ordered the electric fuel pump and will installed that when it comes. I worked on the front deck stuff....I will have to get under the deck in order to match drill some of the holes from the ribs to the front top skin. I also had all of the angle attachment brackets made...or so I thought. There are 2 more sets of brackets that are not on the plan page for the 9A, but on the 9 sheet. I will make those up tomorrow. Once I have the deck done, I will dismantle it and clean, deburr and dimple all of the parts, then prime. I will probably not permanently install it untill I get into the finish kit...(still not ordered...$$).
' style=

Brake lines are installed

Brake lines are installed

' style=

The front deck is clecoed on and ready for match drilling.

The front deck is clecoed on and ready for match drilling.

' style=

Still need to add some angle brackets and nutplates.....

Still need to add some angle brackets and nutplates.....

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.