KitLog pro

Powered By Kitlog Pro v2.0

Building Juliette Whiskey
' style=
Date:  3-7-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Pushrod, rudder cables, Electric flaps....

Today I began to re-install some of the componets in the fuselage. I started by unrolling the rudder cables and adding the bushings as I fed it through the proper holes. Next I riveted the ends on the small pushrod (for the elevators) and installed it. I'm not sure if this was to go in now, but I thought I would like to get it in before I reinstalled the electric flap....which is what I did next. I also got to install my first safetly wire.....I also began to look at the fuel valve set up...I have debating whether I was going to use the Van's supplied fuel valve or get the Andair valve that a lot of builders are using....I like the looks of the Andair Valve, but it cost over $200. I'll sleep on it and decide tomorrow...or the next day.
' style=

The electric flaps are re-installed...permanently.

The electric flaps are re-installed...permanently.

' style=

The small pushrod is installed....

The small pushrod is installed....

' style=

The Van's fuel valve......

The Van's fuel valve......

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.