KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-14-2012
Number of Hours:  30.00
Manual Reference:  SCAT and Muffler
Brief Description:  SCAT tubing and Mufflers and Misc Stuff

Oct14th 2012

I completed anchoring the two mufflers with the hardware supplied with the Vetterman kit. Then I worked on installing the SCAT tubing for the heat system and routing and securing with Adel Clamps the spark plug wires. Also ordered and installed the final high pressure fuel hose that connects the Airflow main spider to the throttle body. And other misc items that are small and add up but must be accomplished before starting the engine next week.

Time about 30 hours.
' style=

CoPilot Side SCAT Tubing and Muffler Installed

CoPilot Side SCAT Tubing and Muffler Installed

' style=

Pilot Side SCAT Tubing and Muffler Installed

Pilot Side SCAT Tubing and Muffler Installed

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.