KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  11-29-2010
Number of Hours:  1.50
Manual Reference:  SECTION 48-22
Brief Description:  ASN737TW-66 hose clamp and S.S. Screws

SECTION 48-22

November 30th , 2010

Step 1 … I placed the U-1018 Nose Gear Leg Fairing to the WD-1017 Nose Gear Leg Assembly and installed the hinge pin carefully. Sighting through the translucent fiberglass I Match Drilled #19 four holes where the WD-1017 Nose Gear Leg Assembly brackets are visible.
Step 2 … Removed the U-1018 Nose Gear Leg Fairing and added K1000-08 nutplates at each if the four WD-1017 Nose Gear Leg Assembly brackets and countersunk for aAN426AD3-3.5 rivets.
Step 3 … I countersunk the U-1018 Nose Gear Leg Fairing for AN526C832R8 stainless steel screws. Then test fit the fairing to the nose gear leg and added a ASN737TW-66 hose clamp at the top.

Time about 1.5 hour.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.