KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-10-2010
Number of Hours:  6.00
Manual Reference:  Page 41-3 and 41-4
Brief Description:  SECTION 41 UPPER FORWARD FUSELAGE INSTALLATION Pag

SECTION 41 UPPER FORWARD FUSELAGE INSTALLATION Page 41-2

Step 1, After reading this I have decided to wait.

SECTION 41 UPPER FORWARD FUSELAGE INSTALLATION Page 41-3 and 41-4.

Step 1, I added two 7” X 4” access panels with riveted doublers in place. However I am in the process if adding a 7” wide X 3” height additional cut-out for the 12” necessary depth of the Garmin GNS-430

Step 2, not applicable.

Time about 6 hours.
' style=

Two 7” X 4” access Panels with Riveted Doublers

Two 7” X 4” access Panels with Riveted Doublers

' style=

Access Panels

Access Panels

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.