|
|
Conrads X-10 Build Log
|
Date: 1-23-2010
|
Number of Hours: 1.50
|
Manual Reference: 39-6, Step 1 to 3
|
Brief Description: SECTION 39 CONTROL SYSTEM, Page 39-6, Step 1 to 3
|
|
SECTION 39 CONTROL SYSTEM, Page 39-6, Step 1 to 3
Step 1, I fabricated the F-1063C Spacer as described in figure 1.
Step 2, Locate and cleco the two F-1063A Elevator Idler Arms, ,the F-1063C Spacer and the VA-146 Flange Bearing. R=Then final drill the #30 parts in common. Prime and rivet wirh nine AN470AD4-6 rivets as shown in figure2.
Step 3, I bolted the F-1063A Elevator Idler Arms Assembly to the F-1063B Idler Arm Brackets as described in and using the hardware called out in figure 3.
Time about 1.5 hours.
|
|
F-1063A Elevator Idler Arms Assembly to the F-1063B Idler Arm Brackets
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |