KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-26-2009
Number of Hours:  1.00
Manual Reference:  34 -7 Steps 1 to 5
Brief Description:  Section 34 BAGGAGE AREA … Page 34 -7 Steps 1 to 5

Section 34 BAGGAGE AREA … Page 34 -7 Steps 1 to 5

Step 1, I located then cleoed the F-1081 Left Baggage Cover to the F-1034C-L Fuselage Bulkhead and the just installed F-1058 Hinge Frame.

Step 2, Match-Drilled all the #30, #40 and #19 holes in common.

Step 3, After satisfied with the drilling I removed the F-1081 Left Baggage Cover, deburred,
removed the shinny alodine, cleaned with acetone and primed with DTM primer.

Step 4, I cut one layer of ½ inch Double Insulated thermal and sound protection insulation to fill the cavity between the Side Skin F-1070 and the F-1081 Left Baggage Cove. Placed using 3-M adhesive. After drying the part I began riveting the F-1081 Left Baggage Cover using the rivets called out for in figure 2.

Step 5, Also riveted the four nutplates as shown.

Time about 1 hour.
' style=

F-1081 Left Baggage Cover Installed

F-1081 Left Baggage Cover Installed

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.