Conrads X-10 Build Log
|
Date: 11-12-2009
|
Number of Hours: 8.00
|
Manual Reference: Steps 12 to18
|
Brief Description: Section 32 TAILCONE ATTACHMENT … Page 32 -5 Step
|
|
Section 32 TAILCONE ATTACHMENT … Page 32 -5 Steps 12 to 18
Step 12, I began the riveting task by riveting the Skins to the F-1006A,B and C Bulkheads.
Step 13, Next came the rivets in the aft edge of the bottom F-1077 Mid Bottom Skin.
Step 14, Riveted the F-1077 Mid Bottom Skin to the F-1019, F-1020 and F-1021 Baggage Ribs.
Step 15, Riveted the F-1070-L Mid Side Skin to the F-100100A Baggage Door Shim and F-1023-L Baggage Floor Angle.
Step 16, Riveted the F-1070-L/R Mid Side Skins to the F-1046 –L/R$ Mid Fuselage Longerons.
Step 17, Riveted the F-1019, 20 and 21 Baggage Ribs to the F-1006B Bulkhead.
Step 18, I installed the two SB625-7 Snap Bushing in the 5/8” holes in the F-1006B for the Rudder cables.
Finally I have completed attaching of the Tailcone assembly to the Fuselage !! On to the Baggage Section 33....... : )
Time about 8 hours because of the riveting tasks.
|
|
Rivets in the Aft Edge of the Bottom F-1077 Mid Bottom Skin
|
|
Riveting Skins to the F-1006A,B and C Bulkheads
|
|
|
|
|
|
|
|
|