|
|
|
|
Conrads X-10 Build Log
|
Date: 10-19-2009
|
Number of Hours: 2.50
|
Manual Reference: 30-2 Steps1 .. 7
|
Brief Description: Section 30, STEP INSTALLATION …. Pages 30-2, Steps
|
|
Section 30, STEP INSTALLATION …. Pages 30-2, Steps 1 to 7
Step 1, I marked and then drill with a #10 drill the F-1038 Step Support Block in four places as described in figure 1.
Step 2, I deburred the end edge of the WD-1007-L/R Step.
Step 3, Inserted the Step into the side of the fuselage and then into the WD-1008-L/R Step Mounting Bracket and further into the F-1038 Teflon Support Block and rotated the block to find the top, bottom, forward and aft position of the block.
Step 4, I clecoed according to the plans the F-1022A-L/R Baggage Floor to the fuselage but I don’t know why.
Step 5, I drilled two holes using a #12 drill bit and clecoed each hole.
Step 6, Removed the F-1022A-L/R Baggage Floor and finished drilling #12 the remaining two holes. Marked the top and bottom of the F-1038 Teflon Support Block then removed and deburred the holes.
Step 7, Withdrawn the WD-1007-L/R Step and ten bolted the F-1038 Teflon Support Block with four each AN3-11A bolts, AN960-10 and AN365-1032 nuts and torqued to 27 in/lbs each.
Time about 2.5 hours for both Left and Right Steps
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |