KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  9-7-2009
Number of Hours:  1.00
Manual Reference:  28-12 step 1 to 2
Brief Description:  Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS

Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS … Page 28-12, steps 1 to 2.
Step1, I riveted the Fwd Fuselage Bulkheads to the F-1072 Fwd Fuse Bottom Skins as shown in figure 1.
Step 2, Riveted the Fwd Fuse Floor Ribs to the F-1043A-R/L to the F-1049A-R/L.
Time about 1 hour.
' style=

Riveted the Fwd Fuselage Bulkheads to the Fwd Fuse Floor Ribs

Riveted the Fwd Fuselage Bulkheads to the Fwd Fuse Floor Ribs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.