Brief Description: Section 26 Mid. Fuselage Ribs and Bottom Skins. P
Section 26 Mid. Fuselage Ribs and Bottom Skins. Page 26-7 Step 1 .. 2. Step 1, I removed the blue plastic wrap from both of the bottom skins and proceeded to cleoc to the now up righted Ribs and Bulkhead section. I added mover dollies I purchased to the bottom spar that now allowed me to move the completed assembly around the garage when necessary. Step 2, After “hanging” the tow skins F-1077, Mid Bottom Skin and F-1076 Center Bottom Skin to the ribs and bulkhead as shown in Figure 1 I drilled all #40 holes in common except the top two rows. And added the Floor Stiffeners F-1016B L/R. But before clecoing I final Drilled using a #30 drill the #30 holes. Time about 3 hours because of 95 degree heat in the afternoon.
Mid Bottom Skin and F-1076 Center Bottom Skin Clecoed adn Ready for Final Drilling
Backside of the Mid Bottom Skin and Center Bottom Ski