Brief Description: Completed Section 8-6 on the Horizontal Stabilizer
11/06/2008…. Today after work I completed Section 8-6 on the Horizontal Stabilizer. The page was 4 individual steps that were riveting the HS 1002 Front Spar the HS 1007 Front Spar Doubler, the HS 1013 fronts Cap(s) and the HS 1008 L and R Front Spar Attachment Brackets. Steps 3 and 4 were trimming HS 1004 Inspar Ribs. Time about 2 hours…