KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-8-2008
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Beganning the Hortizontal Stab

08/06/2008 Section 8. Today I began the Hortizontal Stab. Section 8 8-1 to 8-5. Nothing special except I was forced to self fabricate brackets HS 1008-L and R. This task only took about 45 minutes for each individual bracket. Time about 8 hours.
' style=

Horizontal Stab Spar with Doubler

Horizontal Stab Spar with Doubler

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.