KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  1-17-2009
Number of Hours:  12.00
Manual Reference:  Page 18-2
Brief Description:  Section 18, Page 18-2, Steps 5 to 6

1/17/2009 ….. Completed steps 5 to 6 for the Left tank on page 18-2. After removing all the stubborn blue plastic protective warp I place the Tank Skin T-1001 L made out of .032 2024 aluminum into the cradle used for the Leading Edge Skin Assembly and clecoed all the Tank Stiffners T-1101 and the VA-112 Drain Flange to the skin as described in Figure 4. I then Final and Match drilled all the #40 holes as necessary. Finally I clecoed the Tank Outbaord End Rib T-1003, Tank Inboard Rib Fwd T-1003C-R and the Tank Interior Ribs T-1004-L to the Tank Skins T-1001L. Also added J-Channel stiffner and final drilled the to the assembly. Time about 6 hours each tanks, or 12 hours total
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.