KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  1-24-2009
Number of Hours:  8.00
Manual Reference:  Page 18-4
Brief Description:  Section 18 Fuel Tank, Page 18-4

1/24/2009 …… I have completed the dimpling of the T-110L Tank Skin, T-1002 Tank Baffles, Tank Stiffeners and the T-406B Fuel Cap wing the C-Frame and custom built table. Then deburred and counter sunk where necessary the entire assembly. Also I completed steps 1 to 5 on page 18-5 that are concerned with riveting Spacers T-1005B and C and the VA-146 Bearings to the T-1005-L/R assembly. Time about 8 hours for the Left Tank .
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.