KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  1-6-2009
Number of Hours:  5.00
Manual Reference:  Page 17-3
Brief Description:  Section 17 Outborad leading Edge, Page 17-3 Compl

1/6/2009 … Section 17 Outborad Leading Edge, Page 17-3 Completed Steps 1 to 8 for both left and right sides of the Outboard Leading Edges. I placed the Leading Edge Skin W-1001 L into the fabricated cradle as shown in Figure 1 and added by means of cleco the five Ribs W-1009-L and R and the single Rib W-1008R along with the deburred Splice Strip W-1019L into place. Next I added the J-Channel aluminum Leading Edge Stiffener W-1026 as shown and after securing the entire assembly I match and final drilled all the #40 holes with an air drill and using a #19 drill bit enlarged the screw holes on the Splice Strip W-1019. The machine counter sunk the #40 nut plate attachment holes in the Splice Strip for the head of an AN426AD3 rivet. After accomplishing this I then disassembled the Leading Edge assembly. This completes steps 1 …8. Time for both Outboard Leading Edges about 5 hours.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.