1/11/2009 … Riveted the Leading Edge Skins W-1001 L/R to the Leading Edge Ribs W-1008 and W-1009 as described in Figure 1 and 2 page 17-4 steps 1 to 5. Also, attached the completed assembly to the Main Spar Assembly Flanges. Time about 10 hours for both Left and Right Wings.