KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-9-2009
Number of Hours:  3.00
Manual Reference:  22-4 Step 1 and 2
Brief Description:  FL-1005-R/L Main Ribs.

05/11/2009 … 22-4, Step 1 and 2. Step 1 was to trim off a small tab off all the FL-1005-R/L Main Ribs. I accomplished this with some tin snips and the task was accomplished very quickly. See Figure 1 for details on the amount to be removed. Step 2, is to clecoed all the previously created sub-assemblies FL-1004-L Nose Rib, FL-1005-L, FL-1005-R Main Ribs, the Rod End Ribs Center Hinge Sub-Assembly and Hinge Pairs to the FL-1003-L Spar and getting all the ribs flanges facing the correct direction as described in Figure 2. Finally Final Drill #30 all common holes of these items to the main spar. And then repeat the process for the Right Aileron. Time about 3 hours.
' style=

FL-1005-R/L Main Ribs, Nose Ribs Attached to the Main Spar

FL-1005-R/L Main Ribs, Nose Ribs Attached to the Main Spar

' style=

Sub-assemblies FL-1004-L Nose Rib, FL-1005-L, FL-1005-R Main Ribs, the Rod End Ribs Center Hinge Sub-A

Sub-assemblies FL-1004-L Nose Rib, FL-1005-L, FL-1005-R Main Ribs, the Rod End Ribs Center Hinge Sub-A

' style=

Right sub-assemblies FL-1004-L Nose Rib, FL-1005-L, FL-1005-R Main Ribs, the Rod End Ribs Center Hinge

Right sub-assemblies FL-1004-L Nose Rib, FL-1005-L, FL-1005-R Main Ribs, the Rod End Ribs Center Hinge

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.