KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  1-9-2010
Number of Hours:  0.25
Manual Reference:  OP37-7 Step 1 to 2
Brief Description:  Section OP37- RV-10 WIRING HARNESS Page OP37-7 Ste

Section OP37- RV-10 WIRING HARNESS Page OP37-7 Steps 1 to 2

Step 1, Drilled three #19 holes for G4 wire clamps.

Step 2, Drilled out for a #19 AN509 screw and then machine counter sunk then added a G-8 clamp to the F-1042 Right side.

Time .25 hours
' style=

Master Relay Connected

Master Relay Connected

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.