KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  12-6-2009
Number of Hours:  1.00
Manual Reference:  35-10 Steps 1 to 3
Brief Description:  Section 35 ACCESS COVERS and FLOOR PANELS Page 35-

Section 35 ACCESS COVERS and FLOOR PANELS Page 35-10 Steps 1 to 3

Step 1 and 2 Not much to do as I had already #19 drilled, deburred and primed the two the F-1050B Bolt Access Plates

Step 3, I have ordered the Vent SV-1 Removet Vent that even though it is called out for in the plans was NOT included on the inventory parts list. So I ordered it from the Van’s master list for just $6.25 each.

I have received the vents and after scuffing up the attachmetn places to enhance adhesion I coated with Pro-Sea and fianl painted.

Time about 1 hour.
' style=

The right Vent SV-1 in place

The right Vent SV-1 in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.