KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  10-16-2009
Number of Hours:  3.00
Manual Reference:  29-20, Steps 1
Brief Description:  F1050 L and R Cabin Floor Panels Section 29, FUSEL

Section 29, FUSELAGE SIDE SKINS …. Pages 29-20, Steps 1

Step 1, I fit and cut the ½ inch wide double foil sound and heat insulation to fit both the F1050 L and R Cabin Floor Panels and then using the previously cut insulation as a pattern I cut an additional sound layer out of Super Sound Proofing from Spruce Specialty for a total of at least 1 inch of combined sound proofing. Then after placing the two into the aircrafts’ pilot and co-pilot floor boards I riveted as described in figure 2 using both LP4-3 and CS-4-4 pop rivets.

Work time about 5 hours.
' style=

First Step Double Insulated 1/2

First Step Double Insulated 1/2" foil layer

' style=

Second, Super Sound Proofing over teh foil layer for excess of 1

Second, Super Sound Proofing over teh foil layer for excess of 1" heat and sound proofing

' style=

Third< insullation complete and riving with both LP4-3 and CS-4-4 pop rivets

Third< insullation complete and riving with both LP4-3 and CS-4-4 pop rivets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.