Date:  11-20-2008
Number of Hours:  2.00
Manual Reference:  Section 13-4
Brief Description:  Section 13-4 ... Steps 6 to 10 on page 13-4

11/20/2008 …. Section 13-4 ... Steps 6 to 10 on page 13-4. I fabricated the Tie Down Bracket W-1020 as specified in Figure 2. And then match drilled the Tie Down Bracket W-1020 to the as shown in Figure 3 to the W-SPAR Assy-L and R. After match drilling I match drilled using a #40 bit for the nut-plates as shown in Figure 4. Then on the back side of the Tie Down Brackets I counter sank the nut-plat attachment rivets after deburring the entire assembly. Time about 2 hours for both brackets.
' style=

Fabricated this Tie Down Bracket for the Right  Wing

Fabricated this Tie Down Bracket for the Right Wing