KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  1-1-2011
Number of Hours:  8.00
Manual Reference:  None
Brief Description:  Wheel Fairings Final Primer Paint, Nutpls to the B

Supplemental 12/30/2010

1) Today I completed the final primer coat with the DTM white primer over the Wheel Fairing set and placed them in storage until ready to final paint and install on the completed X-10.

2) Decided to add K1000-06 nutplates and stainless steel screws to the Bottom Rudder Fairing to make the fiberglass fairing removable as I have the Whelan Tail Strobe located in the Bottom Rudder Fairing.

3) Finally, I added a chain and spring mechanism to prevent the Baggage Door from opening too much and damaging the door hinge and fuselage when a wind gust hits the Baggage Door when open. Simple but necessary solution.

Time around 8 hours for all three items.
' style=

Baggage Door Opener

Baggage Door Opener

' style=

Spring Prevents Abrupt Stoppage of Door Swing

Spring Prevents Abrupt Stoppage of Door Swing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.