KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
' style=
Date:  7-4-2010
Number of Hours:  4.00
Manual Reference:  SECTION 45-04
Brief Description:  Clecoed the C-1002A-L/R Outside Door Shells and C

SECTION 45-04

July 4th 2010

Contined Sanding the edges of the Cabin Canopy until with-in tollarance of 1/16" to 1/8" of the
C-1002B L/R Cabin Inter Shells with the new palm air sander I just purchased.

Step 1, Using the geometry method I located and drilled #40 the open rivet holes in the fuselage into the C-1002A-L/R Outside Door Shells and C-1002B L/R Cabin Inter Shells to the fuselage. Then I clecoed each of the holes. The door is temp secureed in place.
' style=

Cleco's in Place to Hode the Door Shells Securely

Cleco's in Place to Hode the Door Shells Securely

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.