KitLog pro

Powered By Kitlog Pro v2.0

Lightning
' style=
Date:  1-17-2008
Number of Hours:  1.50
Manual Reference:  Section 1
Brief Description:  Fuselage Preparation III

Cut out the outlets of the fuselage NACA ventilation ducts and spent time sanding the fuselage flange.

I am thinking I will look for a Corvette painter when the time comes, but I will try to prepare it as best I can, so I am working on smoothing the flange all the way around.

Finished cutting out the starboard D-shaped hole at the wing root.

I bought some Sabre bits for my Rotozip. I think they were a bit better, but I still cannot cut more than about 3 inches before they overheat.
' style=

behind cockpit

behind cockpit

' style=

vertical stabilizer

vertical stabilizer

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.