Back in the saddle!! I took a break due to cold temps and doing some house projects. Anyway, today's objective was to put in the SafeAir kit static ports and line. After totally screwing up and drilling a large hole on each side as if to install on the outside, I realized my error and made patches, riveted them on. After making the correct 1/4" hole, I used JB Weld to attach them after doing a little research, then installed the lines (must be cut precisely perpendicular - had razor shears from Sears). I will have to probably remove the line briefly when it is time to rivet the top skins.