KitLog pro

Powered By Kitlog Pro v2.0

Serenity
' style=
Date:  7-10-2008
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Baggage floor day 5

Finished floors. Made brackets first to support the strobe power supply, then bolted it on. Finished by riveting floor. Found out Hartwell latch interferes with power supply top - arghh! Too much work making and installing the brackets, so I drilled out the latch and will likely just screw the lid down or put velcro. It really doesn't matter as carpet will cover all this... . Last, went and riveted the F-706 and 707 gusset plates.
' style=

Made these support brackets for strobe p/s. Left bare area for good grounding.Tail strobe wire above.

Made these support brackets for strobe p/s. Left bare area for good grounding.Tail strobe wire above.

' style=

Strobe power supply bolted on.

Strobe power supply bolted on.

' style=

Pop riveting floor in.

Pop riveting floor in.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.