KitLog pro

Powered By Kitlog Pro v2.0

Serenity
' style=
Date:  2-1-2007
Number of Hours:  1.50
Manual Reference:  
Brief Description:  left fuel tank plumbing

Started dry fitting fuel tank plumbing parts, fitting antirotation brackets, running vent line. Also bent float rod to specs and attached to fuel capacity sender. Checked resistance at full and empty positions - close to spec at 30,5 and 249 ohms. Attached vent line rib snap bushings. Played with Rolo-Flair tube flairing tool to understand operation. Pics are from later date, but illustrate fabrication of the vent line.
' style=

Parker Rolo-Flair tool - makes precise 37 degree flares

Parker Rolo-Flair tool - makes precise 37 degree flares

' style=

Vent tube after flaring - getting ready to attach fitting

Vent tube after flaring - getting ready to attach fitting

' style=

End result with vent line snaking thru ribs to opposite end of tank at high point

End result with vent line snaking thru ribs to opposite end of tank at high point

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.