Powered By Kitlog Pro v2.0
Chris's RV-14A Site
RV-14A
Final assembly
10-1-2018
< Previous Log Entry
Next Log Entry >
Date:
10-1-2018
Number of Hours:
6.00
Manual Reference:
Brief Description:
Heat muffs / scat tubes
Got the heat muffs on the all of the scat tubes connected. This was a chore trying to get the muffs to line up correctly and the tubes run properly. Long day but its all ready to go now
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
517
2694
Avionics
59
320
Avionics/Electrical
59
320
Empennage
38
157
Engine
24
111
Final assembly
22
97
Finish Kit
34
170
Firewall Forward
11
49
Fuselage
112
667
Miscellaneous
4
8
Painting
38
218
Prop
1
2
Rear Fuselage
14
67
Shop Supplies
1
4
Wings
100
504
Copyright © 2001-2024 Matronics. All Rights Reserved.