Brief Description: Left wheel pants, start cowling
Attached the left intersection fairings by coating the attaching surfaces with Super Fil expoy and affixing the upper and lower fairings into place while the expoxy cures. This step gives the parts a perfectly aligned mating surfaces. Moved on to start the cowling by highlighting the scribe lines for trimming. All of the ines are visible in the molded parts so that makes it pretty easy to identify where to trim. Cut out the oil access door and trimmed the edges to the marks. I have a flush fastener kit from Skybolt that I'm going to use vs the kit butterfly wing screws.