Ran the rudder cables up to the pedals. I need to paing the attach brackets before I can bolt the cables to the pedals but the rest is completed. The hardest part is getting the adel clamps around the nylon sleeves and bolted to the tunnel sides. You need very small hands and lots of light to get in there and get the nuts started. After a couple hours messing with them, I got them on and tightened. The cables go through the tunnel sides with nylon blocks just like in the tail end where the cables exit the fuselage. Easy work to add countersinks to the blocks then pull rivet to the tunnel sides.