Before I could go too far with the wiring, I needed to finish out the sub panel. I have to run some wire through the panel and can't terminate then it the panel has to be removed. I took out the right side sub panel and made a filler panel for the hole that was supposed to house the map box. I primed the panel and riveted everything together. I then riveted both panel halves together and to the fuselage. It's not going anywhere now.