Now that the proseal is curred I riveted the flanges in place. I then mixed up a bit more proseal and put some on the pop-rivet statis port before installing. I punched the center rod out of the pop-rivet and now it is a static port.
I started working on the static line routing. There are two ports that are interconneted. The statis lines need to run to a high-point before going to the instruments to prevent moisture from the port damaging the instruments. I need to order a 2 into 1 fitting for where the two port line meet and connect to the line that goes to the ADAHRS abd forward to the panel.