KitLog pro

Powered By Kitlog Pro v2.0

COLIN'S WEB SITE
' style=
Date:  3-4-2012
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Empennage to Fuselage Assembly 7

More work on the same day (well night in this case, it is after midnight, so time for a new entry).

I continued fitting the vertical stab to the fuselage. I pilot-drilled the forward attach plate to the vertical and horizontal stabs. I verified that everything was vertical and then drilled the lower postion of the vertical the the aft bulkhead. I also drilled the control stop / attach bracket to the vertical stab and longerons. Next up I need to drill all the holes to final size and rivet the forward attach plate to the vertical stab. It's to late to be making that much noise so I'll do that another day.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.